Cargo Details:
4 x 24MVA Power Transformers
Scope:
DAP, including Jack & Skate Installation
Dimensions:
LWH: 7.26 x 3.1 x 3.61m
Weight:
72 Tonnes
Shipment Size:
263.80 FRT
Load Port:
Taicang, CN
Discharge:
Brisbane, AU
Destination:
Bundaberg, QLD

AAW managed the successful delivery of a 72-tonne transformer and associated accessories from Brisbane Port to the Bundaberg Solar site, 400km north of Brisbane. 

While smaller than some of our recent projects, this move was no less critical, requiring careful planning, route analysis, and precise execution to ensure the safe transport of essential equipment. 

Our team provided end-to-end oversight, coordinating specialised transport and strict compliance with safety and permit requirements. Upon arrival, the transformer was installed using a Jack & Skate system, ensuring accurate positioning and operational readiness.

This delivery plays a vital role in supporting Australia’s growing renewable energy footprint, reinforcing AAW’s commitment to powering the transition to sustainable energy through reliable and professional logistics solutions.